![]() |
International Society of Science and Applied Technologies |
| A Calendar-Time-Based Preventive Maintenance Policy | ||||
| Author | Peng Liu
|
|||
| Co-Author(s) | Guanjun Wang
|
|||
| Abstract | In this paper, a calendar-time-based maintenance policy is considered, in which a system is repaired at failures during the time interval [0, L], and is replaced at the calendar time L+I or at the first failure after time L, whichever happens first. The repair type is supposed to be minimal repair and the repair time is a random variable. We derive the long-run average cost rate of the system and obtain the optimal L* and I* numerically
|
|||
| Keywords | calendar-time, preventive replacement, minimal repair, long-run average cost rate | |||
| Article #: RQD27-113 | ||||
Proceedings of 27th ISSAT International Conference on Reliability & Quality in Design |